Overhead Crane Installation & Removal — Kale Vinç Sistemleri

Overhead (bridge) crane installation and removal is one of the most critical mechanical operations carried out in industrial environments such as factories, production plants and warehouses. At Kale Vinç Sistemleri we provide turnkey overhead crane installation and safe removal services nationwide with our certified technical team.

How Is an Overhead Crane Installed?

A professional overhead crane installation consists of the following stages:

  1. 1Site survey and engineering calculation: Facility height, roof load capacity, runway axis and crane capacity are determined.
  2. 2Runway rail installation: Beam or bracket type rail supports are mounted to suit the roof structure.
  3. 3Bridge and girder assembly: The main bridge is set onto the rail and fixed by welding or bolted connection.
  4. 4Electrical and control system installation: The panel, motors, limit switches and control box are commissioned.
  5. 5Load test and commissioning: Standard lifting at nominal load, a dynamic test at 1.10× and a static test at 1.25× of rated load are performed.
  6. 6Certification and handover: A certificate of conformity to TSE standards is issued and handed over to facility management.

How Is an Overhead Crane Removed?

Removal (dismantling) is required during relocation, overhaul or equipment renewal. Safe removal steps:

  1. 1De-energise and apply lockout/tagout (LOTO procedure).
  2. 2The rope and hook block are removed and moved to a safe area.
  3. 3Electrical wiring and control equipment are disassembled.
  4. 4The bridge and girders are lowered using auxiliary cranes.
  5. 5The runway rail and support structure are dismantled.
  6. 6Equipment is packaged and prepared for storage or transport.

Frequently Asked Questions

How long does overhead crane installation take?

It varies with capacity and facility size, but a standard bridge crane mechanical installation is completed within 2 to 5 working days.

What capacities do you install?

Kale Vinç Sistemleri installs single- and double-girder overhead cranes from 1 ton to 300 tons.

What is the warranty period after installation?

We provide a 2-year warranty on all overhead crane installations we carry out.